TLCD’s first LEED Certified project!

Carl Servais AIA

The construction of Solano College Building 600 was completed last December and we recently received news that the project has been awarded enough points to achieve the level of Certified under LEED 2009 for New Construction and Major Renovations (LEED-NC), making it the first TLCD project to officially achieve LEED certification!

Solano College Board Room

TLCD Architecture was hired as a consultant to Architect-of-Record, Henley Architects + Associates (now A2R Architects) to work throughout the design and construction process of Building 600, a 13,837sf addition and remodel project at Solano College in Fairfield, CA.  The project includes bright new office space for the Solano College Administration and a wonderful new Board Room addition with high ceilings and a curved transom window that provides daylight across the beautifully crafted Cherry wood dais.

SCC_BLDG600_view1straight

Some of the green features of this LEED Certified project include:

  • High-efficiency HVAC system, designed and built by Peterson Mechanical out of Sonoma, CA.
  • High-efficiency LED lighting, designed and built by Sac Valley Electric out of Sacramento, CA.
  • A new high-reflectivity, Energy Star certified TPO roof over new rigid insulation.
  • New insulation at all existing concrete exterior walls that, combined with other energy efficiency measures, pushed the design to perform almost 10% better than California’s already strict Title 24 Energy Code.
  • Tubular Skylights from Solatube that provide natural daylight into open office spaces and corridors in the building that would otherwise have very little access to daylight due to the small amount of windows in the existing exterior. Even during construction, the contractor could work in the sky lit spaces without any electric lights turned on.

As the Project Architect for Building 600, I have to give special thanks to Green Build Energy Group, the LEED consultant who helped guide the team across the finish line, and DPR Construction, the general contractor who built the project with an extraordinary level of care and quality.  This project had a lot of budget and schedule constraints, which made LEED Certification an immensely difficult task that could only have been achieved by the wonderfully collaborative effort of everyone involved.

LEED, an acronym for Leadership in Energy and Environmental Design, is a green building certification program created by the United States Green Building Council (USGBC) in 1998 to recognize buildings that take extraordinary measures towards sustainability in the areas of energy and water efficiency, material and resource efficiency, indoor environmental quality, and site design.  Sustainable design is an important part of all the work we do, and we have several projects that are currently pursuing LEED certification, so we know that Building 600 will be the first of many LEED certified projects at TLCD.

 

Academic Center at College of Marin Nears Final Completion

The new Academic Center at College of Marin, designed by TLCD Architecture and Mark Cavagnero Associates, is rapidly reaching the final stages of construction. Prominently situated on the corner of Sir Francis Drake Boulevard and College Avenue, the splendid combination of massing, materials, and craftsmanship is becoming visible as the scaffolding gradually disappears.

college of marin, new academic center, tlcd architecture, mark cavagnero associates, new constructionOne of the unique features of the building is the grand atrium space, which with the finishes installed, is now showing off wonderful qualities of natural light. The building is expected to be completed in May, with full occupancy by the College in time for the Fall Semester. The project will signal the successful completion of the District’s Measure C Bond program, approved by local voters in 2004.

The Emergency Department – Considerations for Innovative and Strategic Design

Kaiser Permanente, TLCD Architecture, Emergency Department Design, The Center for Healthcare Design
Kaiser Santa Rosa Emergency Department, completed 2010

By Julie Wycoff

I recently had the pleasure of attending a conference focused on Emergency Department design hosted by The Center for Healthcare Design and held at the AIA San FranciscoTLCD Architecture is a corporate affiliate of the CHC which gives us access to a wide array of seminars, webinars and conferences related to healthcare design. The topics presented at the ED Design Conference delved deeply into the current thinking of how Emergency Departments are designed and organized with an eye to better addressing long wait times, delivery of care, and responding to an ever-changing healthcare environment. The presenters were a mix of healthcare providers and designers specializing in Emergency Department design.

Over the course of the discussions, some key themes emerged:

  1. Eliminate Triage

Triage based intake practices are outdated and increase wait times and create backlogs. More and more EDs are going to “Split Flow” patient intake and rapid treatment methods whereby patients are seen immediately and are either treated in a low acuity area or are sent to an ED treatment room. Patients never return to the waiting area, but are constantly kept moving through their care.

  1. Design for Flexibility

Emergency Departments must be designed so that they can respond to all types of patients and all types of events. Rather than designing highly specific treatment rooms, all rooms should be of a universal design that can accept any patient at any time.

  1. Evaluate the Problem

The answer to the problem of overcrowding and long wait times isn’t necessarily adding more treatment rooms or space. Often a thorough evaluation of staffing and patient intake patterns can lead to changes that do not require costly changes to the physical environment.

The Emergency Department is increasingly the primary healthcare access point for many in this country not only for trauma patients but for those with chronic conditions to the mentally ill. As such, EDs must be able to rapidly adapt to these types of patients in addition to everything from an infectious disease outbreak to a natural disaster. Designers and providers can work together to create spaces that can effectively deliver care, provide an organized work environment for staff, and a safe, healing space for patients. Knowing the needs of Emergency Departments and the challenges they face allows TLCD to help our healthcare clients plan their Emergency Departments for the present and future.

It Takes a Team to Skin a Hospital

TLCD Architecture, Kaiser Permanente Santa Rosa, Hospital Reclad, Models

The exterior of the existing Kaiser Santa Rosa Hospital, built in the early 1990s was showing the signs of age and was in need of replacement. TLCD Architecture and Swinerton Builders worked together to replace the exterior building skin with a new composite metal panel system. The project not only provided a solution to a deteriorated exterior, it also reinterpreted the original architecture into a contemporary building. The meticulous installation of the composite metal panels was an important aspect of the design and worked with the complexity of the existing building geometry to modernize the identity of the building and campus. The use of virtual models, physical models and on site mock-ups made the precise installation possible and turned the design intent into reality.

The project needed to be constructed in phases to allow the hospital to remain fully operational throughout construction. The design and construction team worked together with the facility to develop construction sequencing and installation strategies that evolved throughout construction to minimize disruptions to the facility and keep them operational.

TLCD Architecture, Kaiser Permanente Santa Rosa, Hospital RelcadTLCD Architecture, Kaiser Permanente Santa Rosa, Hospital Reclad

It was an amazing process to be a part of and the successful results speak to the teamwork involved to “Skin the Hospital”! Check out this video put together by Swinerton Builders for more on the project.

Another MIlestone for Aurora Behavioral Health

The Aurora Behavioral Health Psychiatric Hospital in Santa Rosa has reached another milestone in their efforts to bring the facility to full operating capacity. TLCD Architecture enjoyed working with Aurora Behavioral Health for the renovation of the facility and are gratified to have been a small part of their efforts to bring quality mental healthcare back to Sonoma County. Please read the North Bay Business Journal article for the full story.

Healthcare Design Conference Highlights

http://www.healthcaredesignmagazine.com/sites/healthcaredesignmagazine.com/files/conference/2013-tours/T05--FH-Orlando-Neurosurgery-moveable-MRI-OR_700X522.jpg

The annual Healthcare Design Conference was held in Orlando Florida this year, and  is put on by the Healthcare Design Magazine and The Center for Health Design.  As an attendee of the four-day conference I came away with inspiration, information and invigoration. In addition to the exceptional facility tours, educational sessions, roundtable discussions and networking events, the keynote speakers stood out as the highlight of the conference.

Debra Levin (President and CEO of the Center for Health Design) provided inspiration in her opening address and reminded everyone that we are all working toward the common goal to improve healthcare delivery. The conference was full of chatter about the  Kid President video she showed during her address.

Thomas Goetz (former Executive Editor, Wired Magazine, and Author of The Decision Tree) talked about new ideas and technologies that can mitigate failure and optimize innovation in hospitals, clinics, and other healthcare infrastructure. He touched on everything from data visualization to workplace workarounds, and emphasized the opportunity everyone in the healthcare profession has to apply design thinking to their day-to-day routine.

Michael Murphy (Executive Director and Co-Founder of MASS Design Group) was the recipient of the Changemaker Award, and shared his experience  working with the Butaro Hospital in Rwanda, assisting with architectural solutions to mitigate and reduce the transmission of airborne diseases like tuberculosis.

Jake Poore (President and Chief Experience Officer, Integrated Loyalty Systems and former Disney Executive) closed the conference by sharing practical examples from a 20-year Disney veteran, who is now a “human architect” driven to elevate patient experiences, how patient-driven healthcare design links directly to patient satisfaction and, consequently, the success of the healthcare organization.

Having attended several of these conferences over the years, I find myself using the information and evidence based design resources I learn about in my day to day work on projects and in discussions with clients. TLCD Architecture is a Corporate Affiliate of The Center for Health Design, and I was thrilled to participate in a focus group discussion about next years conference being held in San Diego, CA. The 2014 Healthcare Design Conference will be in an amazing venue and full of relevent evidence-based design information and is well worth attending for professions related and associated with healthcare.

Much Anticipated Psychiatric Hospital Opens in Santa Rosa

As healthcare architects, it’s always rewarding to be a part of a team delivering quality healthcare projects and services. It’s particularly gratifying when those services enrich the lives of people in our own community. The opening of Aurora Behavioral Health Care’s Psychiatric Hospital in Santa Rosa marks the return of inpatient mental health services that have been absent from Sonoma County since 2008.

TLCD Architecture’s team worked closely with Aurora Behavioral Health Care on an extensive renovation of this 52,000 square foot facility once owned by St. Joseph Health System. With the addition of 17 new patient beds, the hospital now has a total capacity of 93 inpatient beds and will meet the much-needed demand for services for adolescents, adults and senior citizens in the North Bay.

The project required significant building infrastructure and interior improvements to meet OSHPD and California Department of Health Services standards. The result is a state-of-the art facility that includes semi-private patient rooms, self-contained nurse stations, activity rooms and a variety of outdoor exercise areas. The hospital’s interior has an overall warm color palette and comfortable contemporary furniture with an emphasis on sustainability.

TLCD Architecture was dedicated to this project and I speak for our entire team when I say we are thrilled to see it’s full realization as a place of healing for the community.

New Academic Center Video Produced by College of Marin

[youtube=http://www.youtube.com/watch?v=skGfw8j-Ixw]

The College of Marin New Academic Center (designed by Mark Cavagnero Associates and TLCD Architecture) received DSA approval last week, and will start construction in the early fall. This informational video was prepared by the College as part of their outreach to the local community.

Kaiser Santa Rosa Hospital Expansion featured in NBBJ article

The North Bay Business Journal featured an article in the June 7th edition titled “Kaiser Tower hits milestone toward October opening”. The project recently met a major milestone, receiving a certificate of occupancy from OSHPD which moves it ever closer to the October 10th grand opening. Jason Brabo was interviewed for this article and describes several of the features of the new facility that will improve patient care and staff efficiencies. As one of the largest construction projects in the North Bay, the Kaiser Hospital Expansion will provide much needed patient facilities to the community.

DSA Deferred Approval for AFSS to Be Eliminated

Click on the image to learn more

DSA has instituted Policy 10-01 which states that DSA will no longer accept projects with automatic sprinkler systems (AFSS) as a deferred approval. Beginning July 1, 2010, projects must be submitted with a complete AFSS plans, hydraulic calculations, product data sheets and seismic bracing design. Projetcs that do not have complete documentation will be rejected as an incomplete submittal. Refer to DSA publication “Plan Submittal Guidelines: Automatic Fire Sprinkler System (AFSS)” for specific design and submittal requirements.