[slideshow]

The Bellevue Union School District held a dedication ceremony to formally open their new district office and dedicate the boardroom to long time Board member Yvonne Kennedy. The district office is located at Taylor Mountain Elementary School and its completion ends 5 years of phased construction projects designed by TLCD Architecture at this new $19 million campus located in southeast Santa Rosa.

The design of Taylor Mountain Elementary includes a central courtyard with focused views to its’ namesake mountain to the east. Classroom pods ring the courtyard and lead to the library/media center. TLCD worked with the teaching staff to refine the pod design in support of the District’s teaching philosophy.

In response to wetlands and a tiger salamander habitat, the site design includes enhanced wetland study areas, bioswales, and stormwater detension basins. The interiors include many energy efficient lighting and mechanical systems, and extensive use of sustainable materials.

TLCD also played a key role in assisting Chevron Energy Solutions with the design and installation of a 176Kv photovoltaic power generating system that will generate a majority of the campus’ electrical power needs.

The later phases of construction used the Lease-Leaseback project delivery method. This provided an opportunity for the General Contractor and major subcontractors to provide valuable input during the design process and a guaranteed maximum construction cost to the District.

Taylor Mountain Elementary School is TLCD Architecture’s second new school completed with Bellevue Unified School District. Our collaborative effort and commitment to providing inspirational learning environments for the students resulted in a project that will serve this growing community for many years.