DSA has instituted Policy 10-01 which states that DSA will no longer accept projects with automatic sprinkler systems (AFSS) as a deferred approval. Beginning July 1, 2010, projects must be submitted with a complete AFSS plans, hydraulic calculations, product data sheets and seismic bracing design. Projetcs that do not have complete documentation will be rejected as an incomplete submittal. Refer to DSA publication “Plan Submittal Guidelines: Automatic Fire Sprinkler System (AFSS)” for specific design and submittal requirements.

One thought on “DSA Deferred Approval for AFSS to Be Eliminated”

  1. We should look at this as an opportunity to find a AFS consultant who can coordinate with our team with BIM